A short video showing the process of Sandjacking™ a driveway. The driveway had settled over 2 inches due to poor compaction after excavated soils had settled. The void was completely filled with a compacted dry sand. The joint between the garage floor and the driveway, broken control joints and cracks are sealed with caulking.